Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 159.73 Million Saudi Riyal
Start Date Jan, 2018
Finish Date Aug, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

Site Infrastructure Works

  • Storm Water Piping System: 800 m.
  • Potable and Fire Water Piping System: 700 m.
  • Sanitary Water Piping System: 500 m.
  • Break Water Storage Steel Tank: 1 no. 6 m dia. Capacity 150 m³.
  • Potable Water Storage Steel Tank: 1 no. 9 m dia. Capacity 400 m³.
  • Make-Up Water Storage Steel Tanks: 2 nos. 14 m dia. Capacity 2,275 m³.
  • Thermal Energy Storage Steel Tank: 1 no. 23 m dia. Capacity 24,000 ton/hr.

Chiller Plant

  • Electric Operated Overhead Cranes: 2 nos. Lifting Capacity 15 ton.
  • Series Counter Flow Water Cooled Centrifugal Chillers: 6 nos. Capacity 3,000 TR each (TOTAL 18,000 TR).
  • Induced Draft Field Erected Counter Flow Cooling Towers: 3 nos. Capacity 12,400 GPM.
  • Chilled Water Pumps: 3 nos. TDH 3 bar, Capacity 9,000 GPM.
  • Condenser Water Pumps: 3 nos. TDH 4 bar, Capacity 9,000 GPM.
  • MV Switchgears: 2 nos. 4.16 kV and 3 nos. 13.8 kV
  • Diesel Generator: 1 no. 300 kVA

Pump Stations

  • Make-Up Water Pumps: 4 nos. TDH 2 bar, Capacity 376 GPM
  • Fire Pumps: 2 nos. TDH 9 bar, Capacity 750 GPM
  • Submersible Pumps: 2 nos. TDH 3.5 bar, Capacity 1,200 GPM
  • Excavation and Backfilling
  • Expansion Tanks
  • Basket Strainers
  • Firefighting FM200 Clean Agent System
  • Air Handling Units, Package Units, Fan Coil Units and Exhaust Fans
  • Chemical Treatment System
  • Access Control System & SCADA
  • Area Lightning System
  • Telecommunication System