Project Description
Contractor | Faisal Electro-Mechanical Co. Ltd. |
Location | Jubail, KSA |
End User | Universal Metal Coating Co. (Unicoil |
Client | Universal Metal Coating Co. (Unicoil) |
Project Management | |
Consultant | |
Type of Project | Industrial |
Total Value (SAR) | 6.3 Million Saudi Riyal |
Start Date | Nov, 1996 |
Finish Date | Nov, 1997 |
Total Land Area | |
Total Built-up Area |
Work Description
Installation of Equipment for Metal Coating Plant
Scope of Work
- Installation of Process Machinery (Mech. & Hydraulic), with 91 Tons of Steel Structure.
- Erection of Mechanical Equipment viz. Compressors, Dryers, Pumps, Chemical Coating / Painting System and Chemical Injection Control System.
- Installation of All Pipelines (including Inter-connecting Piping to Machines) with Utility Pipe Supports.
- Supply & Installation of seven (7) nos. Exit / Entry Accumulator Towers, Coater Room Equipment (Flame Proof)
- Installation of HVAC System, including Hot & Cold Duct Works.
- Installation of Fire Fighting Sprinkler System, Fire Alarm, Fire Protection & Monitoring System, and FM 200 Fire Extinguishing System.
- Erection of Transformers, Isolators, MCCs & other Control Systems and all Grounding Works.
- Installation of CCTV, Video Camera, Monochrome Monitor & Public Address System.
- Installation of 36.5 KM of LV Power / Control / Instrument Cables, and 38 KM of Wiring with Fixtures.