Project Description
MEP Contractor | FEMCO & YUKSEL Consortium |
Location | Jeddah, KSA |
End User | Ministry of Higher Education |
Client | King Abdulaziz University |
Project Management | University PM |
Consultant | Fluor Consultants |
Type of Project | District Cooling & Infrastructure |
Total Value (SAR) | 43.87 Million Saudi Riyal |
Start Date | May, 2013 |
Finish Date | Jan, 2014 |
Total Land Area | |
Total Built-up Area |
Work Description
Civil, Mechanical, & Electrical Infrastructure Works
Scope of Work
- Supply and installation Chilled water pipilines. Pre-insulated pipes. 750, 600, 450, 400, 350, 300 mm diameter pipes total 7950 meter.
- Supply and installation Packaged ETS Plant; Stainless Steel Double Plate Heat Exchanger, Structural Steel Base, Insulated Double Wall Plant Enclosure, Pumps, Motors and controllers including VFD Drive, Air Separator and Make-Up Water System, Expansion Tank, Chemical Treatment Systems and Chemical Pot Feeder, Valves, Gauges and Piping Accessories, Pipe and Pipe Supports, Pump Vibration Isolation. Electrical Equipments within Packaged ETS plant. DDC Control System with remote workstation Interface Panel. (7 nos. ETS Module. a- 1897Tons (6671.75Kw), b- 2520Tons (8862.84Kw), c- 3010Tons (10586.2Kw), d- 1964Tons (6907.4Kw), e- 2464Tons (8665.89Kw), f- 840Tons (2954.3Kw), g- 1768Tons (6218.1Kw), flanged ends.)