Project Description
MEP Contractor | Faisal Electro-Mechanical Co. Ltd. |
Location | Riyadh, KSA |
End User | Ministry of Higher Education |
Client | King Saud University |
Project Management | University PM |
Consultant | |
Type of Project | District Cooling & Infrastructure |
Total Value (SAR) | 22.26 Million Saudi Riyal |
Start Date | May, 2014 |
Finish Date | Feb, 2016 |
Total Land Area | |
Total Built-up Area |
Work Description
Electrical Replacement Works
Scope of Work
- Generator protection update, Battery charger for Turbine Generators,
- UPS uninterrupted power supply system, Induction Motor squirrel cage 700 HP / 4160V,
- Potential Transformer (type Tested) Metal Enclosed,
- Automatic transfer switch with enclose 600A & 400A, (MCC’s) arc resistance metal enclosed MCC 4160V (incoming C.B. 1200A with 28 (Nos) Motor starters), (Incoming+ TIE C.B with 6. (Nos.) Motor starters),
- Single core cable (1×240, 1×95, 1×70, 1×35, 1x16mm2) CU-XLPE/PVC-5K.v, (1×70, 1×35, 1×10 mm2) CU-PVC-600v,
- Instrumentation cable 16AWG XLP/PVC,
- Control cables 12 AWG XLP/CPE, Station (start-stop Emergency),
- Chiller distribution panel 380/220V (DP-3),
- Motor control center for chiller auxiliary,
- L.V cables single core, section 150 & 50mm2 copper, insulation rate 1000V,
- Ground cable 50 & 16mm2, Metal preparations, 5 pipes, Dia 3 inches, Metal preparations, 2 pipes, Dia 2 inches.