Upgrading of Medium Voltage Distribution Network (4160) Volt and the Protection System for the Local Generation Station at the Central Services Complex

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Ministry of Higher Education
Client King Saud University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 22.26 Million Saudi Riyal
Start Date May, 2014
Finish Date Feb, 2016
Total Land Area
Total Built-up Area

Work Description

Electrical Replacement Works

Scope of Work

  • Generator protection update, Battery charger for Turbine Generators,
  • UPS uninterrupted power supply system, Induction Motor squirrel cage 700 HP / 4160V,
  • Potential Transformer (type Tested) Metal Enclosed,
  • Automatic transfer switch with enclose 600A & 400A, (MCC’s) arc resistance metal enclosed MCC 4160V (incoming C.B. 1200A with 28 (Nos) Motor starters), (Incoming+ TIE C.B with 6. (Nos.) Motor starters),
  • Single core cable (1×240, 1×95, 1×70, 1×35, 1x16mm2) CU-XLPE/PVC-5K.v, (1×70, 1×35, 1×10 mm2) CU-PVC-600v,
  • Instrumentation cable 16AWG XLP/PVC,
  • Control cables 12 AWG XLP/CPE, Station (start-stop Emergency),
  • Chiller distribution panel 380/220V (DP-3),
  • Motor control center for chiller auxiliary,
  • L.V cables single core, section 150 & 50mm2 copper, insulation rate 1000V,
  • Ground cable 50 & 16mm2, Metal preparations, 5 pipes, Dia 3 inches, Metal preparations, 2 pipes, Dia 2 inches.

Replacement of Medium Voltage Panels 13.8 kV from Pump Station 1 to Pump Station 4 for Line C and Replacement of the Bus Duct feeding the Panel in Pump Station 1

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail – Riyadh, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 12.95 Million Saudi Riyal
Start Date Apr, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Electrical Works

Scope of Work

  • Removal existing and new installation of MV Panels Pump Station 1 to Pump Station 4.
  • Removal existing and new installation of MV Bus Duct.
  • Termination, testing and commissioning.

Replacement Works for King Abdulaziz University Female 200

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 69.42 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Nov, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

  • Handicapping & Landscaping work.
  • Parking area.
  • Asphalt work; 39,000 m².
  • External lighting.
  • Chilled water piping work (6″ to 20“) – 3560 mt.
  • Potable water piping work (50mm to 200mm Dia) – 2365 mt.
  • Sewage water piping work (110mm to 500mm Dia) – 3445 mt.
  • Irrigation system (20mm to 110mm Dia) – 3550 mt.
  • MV cable 400mm² – 14,400 mt.
  • LV cable system.
  • Cable duct bank for MV & LV
  • Compact substation 400 V – 1500 kVA (2 nos) and 1000 kVA (14 nos).
  • Generator 875 kVA (4nos) and 1500 kVA (2nos).
  • Telecommunication system.

P&C for Sea Water Pump Station (201-C01)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Ras Al Khair, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management Bechtel
Consultant Bechtel
Type of Project Water & Power
Total Value (SAR) 429.33 Million Saudi Riyal
Start Date Dec, 2013
Finish Date Jul, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works. The pumping station shall pump 75.000 m3 / hr sea water to the system network for Ras Al Khair Industrial City when completed.

Scope of Work

Sea Water Cooling Pump Station

  • Vertical Mixed Flow Pump: 4 nos. Capacity 15,000 m³/hr. each (TOTAL 60,000 m³/hr.).
  • Mechanical Bar Screen: 4 nos. Capacity 15,000 m³/hr. Clearing Space between bars 80 mm.
  • Travelling Band Screen: 4 nos. Capacity 15,000 m³/hr. Screening Aperture Size 5×5 mm.
  • FRP/GRP Water Piping including Valves and Fittings: 1,780 m up to 3,300 mm dia.
  • Overhead Crane: 1 no. Lifting Capacity 40 ton.
  • Excavation and Backfilling: 45,000 m³ and 5,000 m³.
  • Concrete: 18,000 m³.

HYPOCHLORITE Generation Building

  • Sodium Hypochlorite Generators: 3 nos. Capacity 540 kVA.
  • Seawater flow through one Generator: 50 m³/hr.
  • Hypochlorite Production: 100 kg/h.
  • Hypochlorite Concentration: 2,000 ppm.
  • Seawater Booster Pump: 2 nos. TDH 1.8 bar Capacity 528 GPM.
  • Automatic Self-Cleaning Filters: 2 nos. Capacity 528 GPM.
  • Sodium Hypochlorite Storage FRP Tank: 2 nos. Capacity 80 m³.
  • SEC 115 kV Power Supply: Including design & engineering works of 115kV cabling system.

Site Development

  • Intake Dredging Works: 200,000 m³ Dredging of intake canal.
  • Shoreline Rip Rap Protection: 9,300 m².
  • Shoreline Interlocking: 1,800 m².
  • Toe-Down to Dredged Channel: 600 m³.
  • Grading: 200,000 m².
  • Surfacing: 5,000 m².
  • Asphalt: 12,000 m²
  • Jelly Fish Basin: Length 100 m, Width 60 m and Depth 2 m.
  • Cofferdam Temporary Works: 60 x 100 m.
  • Staff Control Building
  • Switchgear Building
  • Workshop Building
  • Guard House
  • SEC Building.

Infrastructure in Girls Colleges in Al Rayyan Complex in Dammam

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 349.92 Million Saudi Riyal
Start Date June, 2013
Finish Date Apr, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works, Project is divided to two stages, Package 1 & 2.

Scope of Work

  • Excavation & Backfilling: 115,000 m³ & 52,000 m³
  • Service Tunnel: 5,500 m
  • Chilled Water Piping System: 11,000 m
  • Storm Water Piping System: 4,500 m
  • Sewage Water Piping System: 4,000 m
  • Potable Water Piping System: 9,000 m
  • Domestic Water Piping System: 9,000 m
  • Irrigation Water Piping System: 66,000 m
  • Fire Water Piping System: 10,500 m
  • Data, Voice, CCTV, Public Address, Fire Alarm Networks: 4,200m x 5 = 21,000 m
  • MV Distribution Network: 29,000 m
  • LV Distribution Network: 19,000 m
  • Water Storage Tanks
  • Fire & Domestic Water Tank: 1 no. Capacity 5,304 m³
  • Potable Water Tank: 1 no. Capacity 2,673 m³
  • Irrigation Water Tank: 1 no. Capacity 2,460 m³
  • Raw Water Tank: 1 no. Capacity 550 m³
  • Pump Rooms
  • Domestic Water Pump Room: 3 nos. TDH 6.5 bar, Capacity 555 GPM
  • Fire Water Pump Room: 2 nos. TDH 13 bar, Capacity 1250 GPM
  • Irrigation Water Pump Room: 1 no. TDH 7 bar, Capacity 397 GPM
  • Potable Water Pump Room: 3 nos. TDH 7.5 bar, Capacity 365 GPM
  • Chiller Plant
  • Water Cooled Centrifugal Chiller: 6 nos. Capacity 2,946 TR each (TOTAL 17,676 TR)
  • Closed Circuit Cooling Towers: 5 nos.
  • Chilled & Condenser Water Pumps
  • MV Switchgears
  • Transformers
  • Motor Control Centres

Infrastructure for KFU Teaching Hospital Project in Al-Ahsa, Phase-1

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Zuhair Fayez Partnership (ZFP)
Type of Project District Cooling & Infrastructure
Total Value (SAR) 290.8 Million Saudi Riyal
Start Date Jun, 2010
Finish Date Jun, 2013
Total Land Area 500,000 m2
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure & Utilities Works

Scope of Work

Site Development

    • Excavation & Backfilling: 263,000 m³ & 220,000 m³
    • Concrete Works: 8,000 m³
    • Asphalt Works: 52,000 m²
    • Curbstone: 10,000 m²
    • Chilled Water Piping System:           4,500 m
    • Storm Water Piping System: 800 m
    • Sewage Water Piping System: 2,200 m
    • Potable Water Piping System: 2,200 m
    • Raw Water Piping System: 2,800 m
    • Well Water Piping System: 500 m for 3 nos. deep well
    • Reverse Osmosis (RO) Unit: 2 nos. Capacity 750 m³/day
    • Break Water Tank: 1 nos. Capacity 500 m³

Chiller Plant

    • Water Cooled Centrifugal Chillers: 6 nos. Capacity 2,151 TR each (TOTAL 12,906 TR)
    • Air Cooler Radiators: 44 nos. Capacity 269 TR each (TOTAL 11,836 TR)
    • Primary Chilled Pumps: 8 nos. TDH 2.6 bar, Capacity 3,250 GPM
    • Condenser Water Pumps: 8 nos. TDH 3.7 bar, Capacity 7,300 GPM
    • Secondary Chilled Pumps: 5 nos. TDH 6 bar, Capacity 5,700 GPM
    • Boilers: 4 nos. Capacity 7,710 kg/hr

Generator Plant

    • Generators: 5 nos. Capacity 2500kVA each
    • MV Switchgear: 1 no. 13.8 kV, 2500 kVA

Pump Rooms

    • Raw Water Pump: 4 nos. TDH 9.5 bar, Capacity 161 GPM
    • Irrigation Water Pump: 3 nos. TDH 6.5 bar, Capacity 250 GPM
    • Fire Pump: 2 nos. TDH 13.5 bar, Capacity 47 GPM

Site Development Base Plan for the University City in Dammam

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 45.13 Million Saudi Riyal
Start Date Jun, 2008
Finish Date Aug, 2010
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Supply, installation and testing and communication for infrastructure work for housing accommodation area
    of the new campus
  • Irrigation network with all accessing including control system
  • Raw, sweet, sewage and storm water networks
  • Fiber optic networks for all low current voltage systems
  • BMS, CCTV, Data, Telephone Network System
  • Medium voltage and low voltage cable network
  • Transformers and substations
  • External lighting
  • Road and park including backfilling, sub base, base course, and asphalting
  • Slope protection and interlock

Preparation of Infrastructure for the University City in Al-Ahsa, Phase-3, Stage-1 (King Faisal University Permanent Campus in Al-Ahsa)

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Zuhair Fayez Partnership (ZFP)
Type of Project District Cooling & Infrastructure
Total Value (SAR) 600.95 Million Saudi Riyal
Start Date Aug, 2007
Finish Date Dec, 2011
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works for Four (4) Sub – Packages as detailed below

Scope of Work

  • Excavation & Backfilling: 428,000 m³ & 1,028,000 m³
  • Concrete Works: 50,000 m³
  • Asphalt Works: 325,000 m²
  • Chilled Water Piping System: 14,800 m
  • Sweet Water Piping System: 9,000 m
  • Sewage Water Piping System: 10,000 m
  • Storm Water Piping System: 13,500 m
  • Raw Water Piping System: 12,000 m
  • Reverse Osmosis (RO) Unit Capacity 3,500 m³/day
  • Sewage Treatment Plant Capacity 3,770 m³/day (2 duty + 1 standby)
  • Chiller Plant
  • Water Cooled Centrifugal Chillers (Multi Stage): 9 nos. Capacity 3,150 TR each (TOTAL 28,350 TR)
  • Evaporator Flow: 3,900 GPM,
  • Water Entering Temp. 58°F
  • Water Leaving Temp. 38°F”
  • Open Circuit Cooling Towers: 8 nos. Capacity 9290 GPM
  • Primary Chilled Pumps: 7 nos. TDH 13.7 bar, Capacity 3,877 GPM
  • Condenser Water Pumps: 7 nos. TDH 4.5 bar, Capacity 9,290 GPM
  • MV Switchgear 13.8 kV
  • Generator Plant
  • Emergency Generators: 2 nos. Capacity 1,000kVA each
  • Diesel Generators: 2 nos. Capacity 1000kW
  • Motor Control Centers (MCC)
  • Street Lighting
  • Panel Boards
  • Grounding and Lightning Protection
  • Pump Rooms
  • SCADA System controlling all campus utility buildings
  • BMS System controlling all Colleagues Building

Preparation of Infrastructure for the University City in Dammam Second Phase (King Faisal University Permanent campus in Dammam)

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 212.84 Million Saudi Riyal
Start Date Jun, 2007
Finish Date Nov, 2009
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Site Cleaning with Excavation / Filling of 1,230,000 cu.mtr. of Soil.
  • Construction of Roads with 590 Poles of Street Lights, Walkways, & Parking.
  • Installation of Sewer &p; Irrigation Piping, and 34 KM of Water Distribution Network.
  • Setting up of Sewage Treatment Plant of 1,600 cu.mtr. / day capacity and Sewage Pump Lifting station of 50 LPS. capacity.
  • Also Storm Water Pump Station of 250 LPS capacity is constructed.
  • Installation of 4 nos. Chiller Plants of 1,300 Tons capacity and
  • 3 nos. Cooling Towers of 3,900 GPM capacity,
  • Laying of 1.4 KM of Hydronic Pipes, together with Chilled & Condenser Water pumps.
  • Installation of R.O Plant of 400 cu. mtr per day capacity.
  • Facilities like: Telephone & Computer Data System, Clock System,
  • MATV, CCTV Surveillance, CCMS / BMS / Fire Alarm System,
  • Sprinklers, FM 200 Fire Suppression System & Fire Hydrants, are included.
  • Electrical Works include: Installation of 16 KM of U / G conduits for Elect.
  • Cabling.
  • 4 nos. of 1,500 KVA Generators for Emergency Power,
  • 4 nos. Power Transformers, 1 no. MV Switchgear and
  • Installation of 28 KM of 15 KV MV Cables, 2 nos. LV Switchgear,
  • MCCs, Power & Lighting Panels, Lighting Transformers.
  • 10 KM of LV Cables, Control Boards, and Photo-electric Switches for Street Lights.
  • Grounding, Bonding, and Lightning Protection System

Preparation of Infrastructure for the University City in Dammam Phase 1, Utility Works. (King Faisal University Permanent Campus in Dammam)

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 90.98 Million Saudi Riyal
Start Date Sep, 2002
Finish Date Aug, 2005
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Development of 77 Hectares area with Excavation / Filling of 774,300 cu.mtr. of soil, preparation of 2.60 KM of Slope Embankment.
  • Construction of Roads with 511 poles of street Lights, Walkways & Parking.
  • Construction of 2.75 KM of Storm Drainage System.
  • Installation of 3.47 KM of Irrigation Piping, and LPG Network of 1.94 KM with
  • Installation of two nos. LPG Tanks with total capacity of 46,000 gallons.
  • Setting-up of R.O. Plant of 600 cu. mtr. per day capacity with Water Well, and with 600 cu. mtr. Underground Water Tank,
  • 600 cu. mtr. Sweet Water Tank and 1800 cu. mtr. Raw Water Tank.
  • Also installed 8.96 KM of Water Distribution Network with pipe sizes ranging from dia.: 25 to 315 mm.
  • Setting-up of Sewage Treatment Plant of 1340 cu .mtr. per day capacity and Installation of 4.62 KM of Sewer Pipelines.
  • Installation of 3 Chiller Plants of 1,300 Tons capacity,
  • 3 nos. Cooling Towers of 3,900 GPM capacity & laying of 6.73 KM of underground Pipes, sizes ranging from 150 to 900 mm. dia.
  • 3 nos. of Chilled & Cond. Water Pumps, 8 nos.of AHUs, & 11 Exhaust Fans were installed.
  • Mech. Works also include packages of Storm Water Pumping Station and Sewer Pumping Station.
  • Construction of ‘Utility Building’ with facilities like: Telephone & Computer Data System, Clock System, MATV, CCTV surveillance,
  • CCMS / BMS / Fire Alarm System incl. Sprinklers, FM 200 Fire Suppression System & Fire Hydrants.
  • Electrical Works include: Installation of 26 KM of uPVC conduits for Elect. Cabling.
  • Emergency Electric Power Sub-station with 2 nos. of 1,500 KVA Generators, Power Transformers,
  • MV Switchgear of MVA / 13.8 MV capacity and Installation of 38.5 KM of 15 KV MV Cables.,
  • LV Switchgear, MCCs, Power & Lighting Panels, Lighting Transformers,
  • 14.7 KM LV Cables, Control Boards, and Photo-electric Switches for Street Lights.
  • Grounding, Bonding, and Lightning Protection System.