Removal of Cement Mortar Lining Debris in Line (B) between PS1 & PS2 of Riyadh Water Transmission System

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management
Consultant
Type of Project Industrial
Total Value (SAR) 6.9 Million Saudi Riyal
Start Date 20 Jan, 2021
Finish Date 28 Jan, 2021
Total Land Area
Total Built-up Area

Work Description

  • Removal of Cement Mortar Lining Debris in Line (B) between PS1 & PS2 of Riyadh Water Transmission System, within 9 days, 24-hour duty, consisting of Excavation & Wrapping Removal, Draining, Cutting, Cleaning, Fit-up and Welding & NDT.

Replacement D31-K-0523A Blower Project @ Shedgum Gas Plant, Saudi Aramco

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Shedgum, KSA
End User Saudi Aramco
Client Saudi Aramco
Project Management
Consultant
Type of Project Industrial
Total Value (SAR) 1.9 Million Saudi Riyal
Start Date Dec, 2019
Finish Date Oct, 2020
Total Land Area
Total Built-up Area

Work Description

  • To replace the existing D31-K-0523A Blower with all required expansion bellows & isolation requirements

Emergency Technical Services for Phase I & Phase II For SWCC Substation in Yanbu – Al Madinah Al Monawara. (Y-MEG-01-006)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Maintenance
Total Value (SAR) 20.86 Million Saudi Riyal
Start Date Mar, 2018
Finish Date Jan, 2021
Total Land Area
Total Built-up Area

Work Description

  • Desal units, Boilers, RO Plants and Turbines maintenance works under supervision of SWCC

SWCC East & West Coast Maintenance Works

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Maintenance
Total Value (SAR) On Call Basis
Start Date Nov, 2017
Finish Date Sep, 2022
Total Land Area
Total Built-up Area

Work Description

Civil & Mechanical works

Scope of Work

  • Firstly: Agreement for inspection and maintenance of water transmission line and Repair Works of Fractures of the Main Transmission Lines.
  • Secondly: Repair Works of Fractures of the Pipelines inside the Main St.
  • Carbon Steel Pipes Ductile Cast Iron Galvanize. Pipe Dia.(200 to 2200 mm)
  • GRP & FRP Pipes. Pipe Dia.(200 to 2200 mm)
  • PCCP & CCP Pipes. Pipe Dia. (200 to 800 mm)

Supply & Piping on “SA” System to Abha Reservoir at SWTF – Shuqaiq

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Shuqaiq, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 2.44 Million Saudi Riyal
Start Date Jun, 2014
Finish Date Jan, 2015
Total Land Area
Total Built-up Area

Work Description

Civil & Mechanical works

Scope of Work

  • Excavation and backfilling.
  • Removal of existing 42‘ pipes, fittings & flanges and replace with the new one of 42″, 36″, & 24″ pipes, fittings & filanges.

Technical Services in First & Second Phase of Desalination Plants in Yanbu and Al-Madinah Al-Monawarah

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 20.86 Million Saudi Riyal
Start Date Aug, 2013
Finish Date May, 2016
Total Land Area
Total Built-up Area

Work Description

Technical Manpower Supply

Scope of Work

Maintenance technical manpower for Boiler & Desal Phase 1 – 2 and R.O.

Preparation of Infrastructure for the University City in Al-Ahsa, Phase-4 (King Faisal University Permanent Campus in Al-Ahsa)

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Zuhair Fayez Partnership (ZFP)
Type of Project District Cooling & Infrastructure
Total Value (SAR) 143.07 Million Saudi Riyal
Start Date Mar, 2011
Finish Date Jun, 2013
Total Land Area
Total Built-up Area

Work Description

The Infrastructure Phase-4 Stage–1 A project is located along the Academic Area, East Loop Road, West Loop Road, Road-A, Male’s Dormitory Area, and Female’s Dormitory Area of King Faisal University Campus, Al – Ahsa.

Scope of Work

  • Roads & Street Improvement Works: 285,000 m²
  • Landscape & Hardscape Works: 90,000 m²
  • Sanitary Sewer Piping System: 3,300 m
  • Storm Water Drainage Piping System: 6,500 m
  • Raw Water Piping System: 4,800 m
  • Sweet Water Piping System: 2,600 m
  • Well Water System: 4 nos. deep wells
  • Chilled Water Piping System: 800 m
  • Providing full operation preventive maintenance and overall maintenance for electro-mechanical network systems for campus & around 15 campus buildings.

Pipeline Coating Rehabilitation

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 44 Million Saudi Riyal
Start Date Jul, 2009
Finish Date May, 2010
Total Land Area
Total Built-up Area

Work Description

Carbo steel 60″ pipeline A & B STOPAQ (visco elastic coating) coating Works (13km)

Scope of Work

  • Excavation
  • Removal of existing polyethylene coating
  • Surface preparation (sandblasting of existing pipes)
  • Application of new protective coating (Visco elastic coating)
  • “Holiday” insulations testing
  • Backfilling / compacting / restoration of berm
  • Replacement of fence, post for vent valves etc.
  • Fabrication / installation of reinforced concrete culvert pipes
  • Sand stabilization

Taprogge Filters for Main Sea Water Header & Sea Water Desal Header with Disposal System

Project Description

Contractor FEMCO & Termomeccanica Consortium
Location Jubail, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 15.2 Million Saudi Riyal
Start Date Apr, 2007
Finish Date Feb, 2008
Total Land Area
Total Built-up Area

Work Description

Electrical, Mechanical, & Civil Works for Taprogge Filters

Scope of Work

  • Installation of 2 nos. dia. 120” and 6 nos. dia. 60” Debris Filter and Debris Container.
  • Supply & Installation of RTR Pipes with Fittings (dias. 120″, 108” & 60″) for Topragge Filter and Drain System.
  • Elect. System: Supply & Installation, of all necessary Cables, Accessories, & Termination for Start-up.
  • Supply & Erection of Main Chamber for 2 nos. 120″ Debris Filter & Drain Pit, and Line Civil Works.

High Point Terminal Ball Valve Replacement (Contracts No: 3400/0306)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client Saline Water Conversion Corporation (SWCC)
Location Riyadh, KSA
Total Value (SAR) 815,000 SAR
Start Date Feb, 2006
Finish Date Mar, 2006

Work Description

Industrial Maintenance