Medical Complex for Female Students – Medical Faculties in the University City (Dentistry Medicine Faculty)

تفاصيل المشروع

شركة فيصل للأعمال الكهربائية والميكانيكية المقاول
الدمام، المملكة العربية السعودية الموقع
وزارة التعليم العالي المستهلك
جامعة الإمام عبدالرحمن بن فيصل العميل
University PM إدارة المشروع
المستشار
مبنى مستشفى نوع المشروع
61,680,000 SR القيمة الإجمالية
May, 2019 تاريخ البدء
May, 2022 تاريخ الانتهاء
15,000m2 إجمالي مساحة الأرض
7,100m2 إجمالي المساحة المبنية

طبيعة العمل

Site Work, Civil, Architecture, Structural, Mechanical, Electrical and Landscape Works.

نطاق العمل

A – Site Construction

  • Construction of Building for Faculty of Dentistry,
  • Construction Concrete and wall works,
  • Construction finishing works, Hollow metal doors,windows and  frames,
  • Landscape works.

B – Electro-Mechanical Works

  • Air Handing Unit (AHU), Exhaust Fans (EF), HVAC works, Fire Fighting works ,
  • Power outlet works , Transformer , Ring Main Unit (RMU), Motor Control Center (MCC)
  • MDB, Data and Telephone System, IP CCTV System,
  • Low Voltage & Medium Voltage Cables works and BMS System,
  • Conveying system elevators (4 pcs), Freight Elevator (1 pcs)
  • Total Area of Building and Landscaping: Faculty land on around 7100 m2 with 15.000 m2 construction area.

Construction and Equipping of Environmental Safety and Control Department Building (ESCD)

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management Parsons
Consultant Parsons
Type of Project Building
Total Value (SAR) 49.32 Million Saudi Riyal
Start Date Dec, 2018
Finish Date Dec, 2020
Total Land Area
Total Built-up Area

Work Description

Electrical & Mechanical works

Scope of Work

Site Civil and Mechanical Works:

  • Site preparation, construction of roads, potable and fire water distribution system, irrigation system and landscaping works.

Site Electrical Power Distribution System and Telecommunication:

  • Supply, delivery, erection, test and commission of package substation, medium voltage cabling, grounding system and construction of telecom duct banks, handholes as per contract drawing.

Environmental Safety & Control Department Building:

  • Construction of ESCD Building consist of implementation of civil, structure and architecture work, mechanical works and electrical works.
  • Construction of Pump Room beside the ESCD Building consisting of civil works, mechanical works and electrical works.