Sewage Works Package 5, East side / City Fanar Project

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User
Client Rikaz Development Company
Project Management
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 11.2 Million Saudi Riyal
Start Date Mar, 2005
Finish Date Aug, 2005
Total Land Area
Total Built-up Area

Work Description

Sewage System consisting of Sewage Network & Lifting Stations

Scope of Work

  • Supply & Installation of uPVC Pipes, diameter ranging from 150 to 400 mm.
  • FRP Pipes from 200 to 800 mm dia. including Valves, Fittings, Inspection Chambers and Manholes.
  • Excavation, De-Watering, Leveling, Back-filling, Compacting and Side Slope Protection.
  • Construction of Lifting Station and Booster Lifting Station which includes
  • Submersible Pumps, Motors, together with Discharge Pipes & Fittings, Check Valve, Gate Valve and Exhaust Ducts.
  • Construction of: Fence, Gates, Walkways, Asphalting,
  • Guard House, Generator Room, and Electrical Room.
  • Architectural Works include Concrete Masonry Units,
  • Elastomeric Membrane Roofing System,
  • Steel Doors & frames, Aluminum Windows,
  • Plastering, Painting, Tiling (interior & exterior) and Toilet Fittings.

RO Maintenance Building at SWCC Jubail

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management
Consultant
Type of Project Building
Total Value (SAR) 3.3 Million Saudi Riyal
Start Date Dec, 2002
Finish Date Dec, 2003
Total Land Area
Total Built-up Area

Work Description

Construction of Workshop Building

Scope of Work

  • Civil, Elect., & Mech. Works for 1,000 sq. mtrs. Workshop building, including Structural Work.
  • Electrical Works include RMU Sub-station for 13.8 KV and Low Current System.
  • Mechanical Works include HVAC Works for 60 Tons Coolinf capacity.
  • Architectural finishing and Furniture Fit-in.

Preparation of Infrastructure for the University City in Dammam Phase 1, Utility Works. (King Faisal University Permanent Campus in Dammam)

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 90.98 Million Saudi Riyal
Start Date Sep, 2002
Finish Date Aug, 2005
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Development of 77 Hectares area with Excavation / Filling of 774,300 cu.mtr. of soil, preparation of 2.60 KM of Slope Embankment.
  • Construction of Roads with 511 poles of street Lights, Walkways & Parking.
  • Construction of 2.75 KM of Storm Drainage System.
  • Installation of 3.47 KM of Irrigation Piping, and LPG Network of 1.94 KM with
  • Installation of two nos. LPG Tanks with total capacity of 46,000 gallons.
  • Setting-up of R.O. Plant of 600 cu. mtr. per day capacity with Water Well, and with 600 cu. mtr. Underground Water Tank,
  • 600 cu. mtr. Sweet Water Tank and 1800 cu. mtr. Raw Water Tank.
  • Also installed 8.96 KM of Water Distribution Network with pipe sizes ranging from dia.: 25 to 315 mm.
  • Setting-up of Sewage Treatment Plant of 1340 cu .mtr. per day capacity and Installation of 4.62 KM of Sewer Pipelines.
  • Installation of 3 Chiller Plants of 1,300 Tons capacity,
  • 3 nos. Cooling Towers of 3,900 GPM capacity & laying of 6.73 KM of underground Pipes, sizes ranging from 150 to 900 mm. dia.
  • 3 nos. of Chilled & Cond. Water Pumps, 8 nos.of AHUs, & 11 Exhaust Fans were installed.
  • Mech. Works also include packages of Storm Water Pumping Station and Sewer Pumping Station.
  • Construction of ‘Utility Building’ with facilities like: Telephone & Computer Data System, Clock System, MATV, CCTV surveillance,
  • CCMS / BMS / Fire Alarm System incl. Sprinklers, FM 200 Fire Suppression System & Fire Hydrants.
  • Electrical Works include: Installation of 26 KM of uPVC conduits for Elect. Cabling.
  • Emergency Electric Power Sub-station with 2 nos. of 1,500 KVA Generators, Power Transformers,
  • MV Switchgear of MVA / 13.8 MV capacity and Installation of 38.5 KM of 15 KV MV Cables.,
  • LV Switchgear, MCCs, Power & Lighting Panels, Lighting Transformers,
  • 14.7 KM LV Cables, Control Boards, and Photo-electric Switches for Street Lights.
  • Grounding, Bonding, and Lightning Protection System.

نظام نقل المياه لمجمع الإسكان في مدينة ينبع – المرحلة الثانية

وصف المشروع

شركة يوكسال انشاءات السعودية المحدودة المقاول الرئيسي
شركة فيصل للأعمال الكهربائية والميكانيكية ذ. م. م المقاول الفرعي
ينبع، المملكة العربية السعودية الموقع
المؤسسة العامة لتحلية المياه المالحة المستهلك
المؤسسة العامة لتحلية المياه المالحة العميل
إدارة المشروع
المستشار
بناء نوع المشروع
45 Million Saudi Riyal القيمة الإجمالية
August, 1997 تاريخ البدء
July, 2002 تاريخ الانتهاء
إجمالي مساحة الأرض
إجمالي المساحة المبنية

وصف العمل

Providing Facilities for Housing Compound (18 Units of 3 Storied Buildings Total 108 Flats)

نطاق العمل

  • Drainage, Plumbing Facilities including Supply and Installation of Sanitary Fixtures
  • Fire Fighting, Potable Water and HVAC System
  • Supply, Installation & Commissioning of Sewage Treatment Plant.
  • Supply & Installation of Elect. Sub-station, Panel Boards, Lighting System, Fire Alarm System, Inter-com System, & Sound System.
  • MV / LV Power Distribution Network.
  • Grounding & Lightning Protection System

محطة ينبع لتحلية المياه والطاقة الكهربائية – المرحلة الثانية

وصف المشروع

شركة يوكسال انشاءات السعودية المحدودة المقاول الرئيسي
شركة فيصل للأعمال الكهربائية والميكانيكية ذ. م. م المقاول الفرعي
ينبع، المملكة العربية السعودية الموقع
المؤسسة العامة لتحلية المياه المالحة المستهلك
المؤسسة العامة لتحلية المياه المالحة العميل
إدارة مشاريع المؤسسة العامة لتحلية المياه المالحة إدارة المشروع
المستشار
الطاقة والماء نوع المشروع
2.7 Million Saudi Riyal القيمة الإجمالية
September, 1995 تاريخ البدء
June, 1996 تاريخ الانتهاء
إجمالي مساحة الأرض
إجمالي المساحة المبنية

وصف العمل

.الأعمال الكهربائية والميكانيكية لمباني التشغيل وملحقاتها

نطاق العمل

:المدخنة

  • الأعمال الكهروميكانيكية على مدخنة المحطة (95Mtrs. Height)
  • تركيب قنوات الغاز واعمال العزل للغلايات
  • الأعمال المتعلقة بتوريد وتركيب الإضاءة، والطاقة، والحماية من الصواعق والتأريض
  • أعمال الأنابيب والصرف الصحي والسباكة

:مباني التشغيل

  • الأعمال الميكانيكية، والسباكة، والتدفئة والتهوية وتكييف الهواء لمباني التشغيل وملحقاتها
  • الإضاءة والطاقة