Project Description
Contractor | Faisal Electro-Mechanical Co. Ltd. |
Location | Jubail, KSA |
End User | Stork Alpha Sabic Group of Co. |
Client | Stork Alpha Sabic Group of Co. |
Project Management | |
Consultant | |
Type of Project | Industrial |
Total Value (SAR) | 36.8 Million Saudi Riyal |
Start Date | Feb, 1999 |
Finish Date | Jul, 2000 |
Total Land Area | |
Total Built-up Area |
Work Description
Elect., Mech., HVAC, Intstr. & Steel Structure Works for Ibn-Hayan Plastic Products Factory – consisting of:
- Artificial Leather Plant (Production capacity: 8 million sq. mtr per annum).
- Wall Cover Plant (Production capacity: 14 millions sq. mtr per annum).
- Cellular Extruded Plant (Production capacity: 6,600 metric Tons per annum).
- Construction of: Main In-Coming Substation & Utility sub station for Plant Load of 18 MVA.
- Construction of: Central Warehouse, Utility area, Pipe Racks, Tank Farm Area and Gas Pipe Metering Skid.
Scope of Work
- Erection of 2,000 MT of Fabricated Steel Structure, with Roof & Walls Cladding.
- Installation of about 450 KM of Pipelines (for Process, Potable Water, Sanitary Industrial Waste, Cooling Water, and Compressed Air) including Hot & Cold insulation and Jacketing of Pipes.
- Plumbing Works for Buildings. Supply, Fabrication, Installation, Testing & Commissioning of HVAC System
- Installation of Chillers, Cooling Towers, Compressors, Pumps, Blowers, Air Handling Units, & Exhaust Fans.
- Installation of Fire Fighting, Fire Alarm & FM 200 System.
- Erection of All Mechanical & Electrical Machinery / Special Equipment for complete Plant.
- Erection of Power Transformers, MV Switchgear, Generator, MCCs, UPS, etc.
- Installation of All Lighting & Power Distribution Inst. & Control System.