Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Stork Alpha Sabic Group of Co.
Client Stork Alpha Sabic Group of Co.
Project Management
Consultant
Type of Project Industrial
Total Value (SAR) 36.8 Million Saudi Riyal
Start Date Feb, 1999
Finish Date Jul, 2000
Total Land Area
Total Built-up Area

Work Description

Elect., Mech., HVAC, Intstr. & Steel Structure Works for Ibn-Hayan Plastic Products Factory – consisting of:

  • Artificial Leather Plant (Production capacity: 8 million sq. mtr per annum).
  • Wall Cover Plant (Production capacity: 14 millions sq. mtr per annum).
  • Cellular Extruded Plant (Production capacity: 6,600 metric Tons per annum).
  • Construction of: Main In-Coming Substation & Utility sub station for Plant Load of 18 MVA.
  • Construction of: Central Warehouse, Utility area, Pipe Racks, Tank Farm Area and Gas Pipe Metering Skid.

Scope of Work

  • Erection of 2,000 MT of Fabricated Steel Structure, with Roof & Walls Cladding.
  • Installation of about 450 KM of Pipelines (for Process, Potable Water, Sanitary Industrial Waste, Cooling Water, and Compressed Air) including Hot & Cold insulation and Jacketing of Pipes.
  • Plumbing Works for Buildings. Supply, Fabrication, Installation, Testing & Commissioning of HVAC System
  • Installation of Chillers, Cooling Towers, Compressors, Pumps, Blowers, Air Handling Units, & Exhaust Fans.
  • Installation of Fire Fighting, Fire Alarm & FM 200 System.
  • Erection of All Mechanical & Electrical Machinery / Special Equipment for complete Plant.
  • Erection of Power Transformers, MV Switchgear, Generator, MCCs, UPS, etc.
  • Installation of All Lighting & Power Distribution Inst. & Control System.